taq2TAQA flow loop visit
Details
TAQA wants to come see the flow loop in person to evaluate for high-isolation-pressure applications.
- Visit is being framed around the high-isolation-pressure use case for — TAQA continues to buy eDarts from under the umbrella but sees a niche for ACCESS where isolation pressure matters.
- Prep work to align with the visit: get the ACCESS mDART materials Rhyan promised TAQA out before they arrive (see action items in ).
Who's involved
Rhyan Stefura Steve Jagush Rory Stones TAQA Kobold
Current state
- Status: tentative
- Confidence: Date is approximate — "two weeks" from a 2026-05-20 forward, so anchoring to 2026-06-03. Confirms once locks an actual date with TAQA. Pushes to
awarded(or rename status toconfirmed) once an exact date and attendee list are pinned; pushes tocancelledif TAQA stops pursuing ACCESS mDART.
Sources (1)
sms
2026-05-20 23:56
proposes
Said by: +12502171004
Here are some texts from Rhyan Stefura giving us an update on TAQA who has interest in our access mDart system. They're still buying eDarts from Interra because ExxonMobil is allowing it, but they still see a place for this when high isolation pressure is required. They're looking for some information from us. They would like to come and see the flow loop in two weeks.