# Raw email — Tundra Torquay frac pre-qual forward

**From:** Jeff Kennedy <jeffkennedy@koboldinc.com>
**To:** benagenttesting@gmail.com
**Received:** 2026-05-20 23:58 UTC
**Gmail thread id:** 19e47d38392604fb

## Body

```
We have two jobs for Tundra coming up in the Torquay region. Attached is a pre-job qualification that lists all the information for these two wells: depth, stage count, temperature, and all the rest of it.

Let's plan for these to be in mid-June. I'll send updated dates in a subsequent spreadsheet with all the rest of Tundra's jobs.

----- Forwarded -----
From: Paul Vos <paulvos@koboldinc.com>
Sent: May 20, 2026 1:05 PM
To: Owen Rush, Saad Khan, Lev Zakharov, Gerry Simmons, James White, Ranald Hollan
Cc: Jeff Kennedy
Subject: Re: Sask Frac Schedule-Pre-Qualification attached-

Gents,

Here's a pre-qual to an in-person pre-qual yet to be scheduled with Tundra.

Paul

----- Forwarded -----
From: Owen Rush <owenrush@koboldinc.com>
Sent: Wednesday, May 20, 2026 10:21
To: Saad Khan, Lev Zakharov, Gerry Simmons, James White, Paul Vos
Subject: FW: Sask Frac Schedule

Paul have a look at these dates. Do we have the pre qual done for the 2 tourquay wells?

----- Forwarded -----
From: King, Mark <mark.king@tundraoilandgas.com>
Sent: May 20, 2026 9:54 AM
To: (external service vendor distribution list)
Subject: Sask Frac Schedule

Hello Everyone, this is our plan for Sask cemented liner fracs.

Mark
```

## Attachments

- [2026-05-20 Tundra-Torquay-New Well Frac Pre-Qualification Checklist.pdf](2026-05-20%20Tundra-Torquay-New%20Well%20Frac%20Pre-Qualification%20Checklist.pdf) — Kobold form D000065 v5, filled with one well's parameters (see pre-qual extract below).

## Pre-qual extract (one well)

- Customer: Tundra Oil & Gas
- Contact: Geoff Puckett, 204-748-4540, geoff.puckett@tundraoilandgas.com
- Formation: Torquay
- Drill Date: 15-Jun-2026
- Liner: 114.3 mm, 17.26 kg/m, P-110, LT&C
- Well depth: TVD 2,000 m, TMD 6,300 m
- Frac stage count: 105
- Frac method: Annular, O-C-O same run, re-opening same run
- Max frac rate: 5 m³/min
- Max treating pressure: 45 MPa, max test pressure: 69 MPa
- Sand: 20/40, target 10 t/stage, 600 kg/m³ vertical density, cumulative ~2,100,000 lb
- Estimated ISIP / end-of-frac diff / re-open diff: 35 MPa
- BHT: ~65 °C (estimated), sweet (<0.5% H2S), HCl synthetic breakdown acid used
- No memory instrumentation, no tracers
- No casing deformation history
- Coiled tubing: 60.3 mm; internal + third-party string models will be provided
- Kobold install with toe port (2,000 unit per form — units appear miss-keyed; verify if MPa vs psi during follow-up)
- Re-qual triggers met: annular rate ≥ 5 m³/min, cumulative tonnage ≥ 1,500,000 lb, temp ≥ 90 °C (form-checked despite BHT 65 °C — verify), stage count ≥ 50, lateral ≥ 2,500 m (TMD-TVD ≈ 4,300 m horizontal)

Jeff's email says "two jobs" but the PDF only describes one well — second well's pre-qual presumably to come.